Understanding the
terms MEP and BIM
MEP:
MEP stands for the Mechanical, Electrical and Plumbing discipline of
construction. The Mechanical part includes firefighting system and
HVAC (Heating, Ventilation, and Air Conditioning). The Electrical
part covers power supply and lighting system. The Plumbing part
includes water supply and drainage management.
BIM:
BIM is the acronym for Building Information Modeling. It refers to a
process of creating working models (3D, 4D or 5D) to design,
construct and manage the building information.
What is BIM
Coordination?
To
ensure all the aspects of MEP works in coordination with each other,
there arises a need of determining clashes between them. Hence,
BIM Coordination comes into
play. BIM Coordination
refers to a process of comparing various models so as to find out any
clashes or conflicts taking place among various MEP elements on the
field.
Why BIM
Coordination?
Benefits
of using BIM Coordination
for MEP are as follows:
-
Avoid field conflicts prior to installation process
-
Provide an early insight into the project through visualization
-
Accuracy in designing
-
Increase in productivity
-
Reduction in cost
-
Timely delivery of the project
-
Accurate decision making
Role of
Coordination Drawings
In
order to maintain coordination between different aspects of MEP, we
require special diagrams known as coordination drawings. Coordination
drawings are produced by contractors that can be reproduced as per
requirements. These MEP Coordination Drawings
showcase the installation of components, materials, and products
within all the mechanical and electrical spaces.
How to apply BIM
coordination in MEP components
The
process of coordinating MEP components is a tough job and it requires
a higher rate of accuracy and precision as even a slight mistake may
result in a substantial loss. The process involves following steps:
-
Analysis Phase: In this phase, the architects and modelers undergo rigorous analysis of the MEP designs and drawings. They collectively come down to a decision on how BIM coordination models will be made.
-
Creation Phase: Here, coordination models are created using software like Revit and AutoCAD. This will ensure integration of all the MEP elements in the model. This means the mechanical, electrical and plumbing elements are working in synchronization with each other.
-
Detection Phase: This phase involves preparing coordination drawings so as to detect the interference amongst the MEP elements. These include 3D and 4D coordinated BIM models to detect the clashes and fix the errors.
-
Modification Phase: It involves the creation of as-built drawings. As-built drawings provide information on site based changes and the modifications that are to be made in 3D models.Role of BIM ManagerIn order to successfully complete the complex task of BIM Coordination, there has to be a BIM Manager who takes care of carrying out the different activities involved in BIM Coordination.A BIM Manager takes following responsibilities:
-
Data Coordination: It involves tracking asset data, building information data, fabrication data and estimation data.
-
Model Coordination: This includes integration of models, content generation and management, element ownership and visibility.
-
Trade coordination: It requires scheduling coordination meetings, issue tracking, conflict resolution, and managing as-built records.
Get to know US
Silicon Engineering Consultants Limited New Zealand is a team of passionate engineering professionals providing
valuable CAD based services to clients across boundaries. We are well
versed in providing services in the field of Building Information
Modeling and MEP. We provide BIM drafting, BIM Design Solution, BIM
outsourcing and BIM Implementation Services.
Naming few of our MEP Engineering services we offer MEP Coordination Drawings, MEP Outsourcing Services, Mechanical CAD Drawings, electrical design services, and Plumbing Piping Clash Detection Services.